NORTHLINKNETWORK ATLAS
1 satellite · one orbital plane
ORBITAL GEOMETRY

Network coverage

Ground stations, satellite passes and transfer routes.

Drag to orbit · Scroll to zoom
Allocated linkVisible / waitingPossible optical link
SIMULATED TIME
Day 1 · 00:00:00
250 km · 89.4 minute orbitSimulated orbit
NORTHLINK PROCUREMENT DIRECTORY

Parts, suppliers & prices

Published prices include source links. Flight hardware requires a specified configuration and supplier quotation. Quantities are planning requirements; NL numbers identify entries in this directory.

Spacecraft + Ku terminalQuotation requiredCustom integration, qualification and launch extra
Three-site mesh · priced itemsUS list prices / MSRP · incomplete installed cost
Two laboratory SDR boardsB210 boards for laboratory use

PartCandidate / specificationQuantityPrice · USD unless statedSource & model

Price check: 25 September 2026. Taxes, freight, currency conversion, installation, configuration, tests and services are excluded. Supplier compatibility and flight qualification require separate verification.